audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

How to Find Wiring Diagrams|Page 4748 > < How to Find Wiring Diagrams|Page 4746
Page 1
background image

Main Relay (Computer/Fuel System): Testing and Inspection

Motronic Engine Control Module (ECM) Voltage Supply Relay -J271-, Checking

Special Tools and Equipment

-

V.A.G 1526A multimeter

-

V.A.G 1594A connector test kit

-

V.A.G 1598/31 test box

NOTE:  The Motronic Engine Control Module (ECM) voltage supply relay -J271- supplies voltage to the ignition coils with power output stages
as well as the Engine Control Module (ECM) at pin 3 and a few additional components. With the ignition switched on, 12 Volts must be present at
the respective ignition coil connector, terminal 1.

Test requirement:

-

Ignition switched off.

Test sequence

How to Find Wiring Diagrams|Page 4748 > < How to Find Wiring Diagrams|Page 4746