audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

How to Find Wiring Diagrams|Page 5219 > < How to Find Wiring Diagrams|Page 5217
Page 3
background image

Terminal

1

Engine Ground (GND)

-

Operate starter briefly.
-

Specified value: approx. battery voltage

If there is no voltage again:

-

Check wire connection from harness connector terminal 1 to Fuel Pump (FP) Relay -J17- via fuse for open circuit according to wiring diagram.
-

Specified value: Wire resistance max 1.5 Ohms

-

If necessary, repair wire connection.

If voltage supply is OK:

Check Ground (GND) activation

-

Connect multimeter for voltage measurement as follows:

Harness connector

Measure to

Terminal

2

B+

-

Operate starter briefly.
-

Specified value: approx. battery voltage

-

Switch ignition off.

If specified value is not obtained:

-

Connect test box to wiring harness of Engine Control Module (ECM), ECM is not connected.  See: Computers and Control Systems/Testing and
Inspection/Reading and Clearing Diagnostic Trouble Codes/Scan Tool Connecting/Test Box, Connecting For Wiring and Component Test

-

Check the following wire connection for open circuit according to wiring diagram:

Harness connector

Measure to

Terminal

2

64

Specified value: Wire resistance max 1.5 Ohms

-

Check the wire for short circuit to B+ and Ground (GND).
-

Specified value: Infinite Ohms (no continuity)

How to Find Wiring Diagrams|Page 5219 > < How to Find Wiring Diagrams|Page 5217