S5 Quattro Coupe V8-4.2L (CAUA) (2009)
-
Using a pry bar, remove the electrical wiring harness from the rear bulkhead.
-
Fold the insulation mat up to gain access to the locking flange cover.
-
Remove the right locking flange bolts - 1 through 4 - and remove the right locking flange cover.
-
Disconnect the electrical connector - arrow - from the right locking flange.
-
Connect a Hand held remote control (jumper) to the right locking flange electrical terminal - 1 -.