audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Radiator|Page 5293 > < Radiator|Page 5291
Page 6
background image

-

Swivel cooler forward and remove upward.

Installing

Installation is performed in reverse order of removal, note the following: 

-

Remove the old O-ring - 2 - in the coolant hose -  3 -.

-

Coat new O-ring with coolant and install it in the coolant hose. 

-

Press the coolant hose onto the radiator - 1 - until it engages audibly.

-

Press the coolant hose on again and pull to make sure the connection is engaged correctly.

-

Install bumper and front bumper cover..

-

Fill with coolant => [ Filling ] See: Service and Repair/Procedures.

‹› Complete coolant must be replaced if the radiator was replaced.

Tightening Specifications

Radiator|Page 5293 > < Radiator|Page 5291