audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Connecting Rod Bearing > < Drive Chain For Power Take-Off, Oil Pump and Balance Shaft, Component Overview|Page 4481
Page 5
background image

-

Tighten bolts - 1 - and - 3 -.

-

Replace balance shaft cover O-ring.

-

Tighten bolts - 2 - and - 4 - on balance shaft cover.

Further installation is in reverse order of removal, note the following:
-

Install lower timing chain cover.

-

Install crankshaft seal, timing chain side.

-

Install oil filter housing.

-

Install intake manifold.

-

Install left and right timing chain covers.

-

Install drive plate.

-

Install vibration damper.

-

Install engine.

-

Add engine oil and check oil level.

Torque specifications

Connecting Rod Bearing > < Drive Chain For Power Take-Off, Oil Pump and Balance Shaft, Component Overview|Page 4481