S6 Quattro Sedan V10-5.2L (BXA) (2007)
-
Unclip socket - 1 -.
‹› For the exact assignment of instrument panel fuse panel refer to the current wiring diagram.
Installing
Install in reverse order of removal, observing the following:
‹› When installing, install cable ties at same location.
-
Install lower instrument panel cover on driver's side.
-
Connect battery. Required actions => See: Starting and Charging/Battery/Service and Repair/Battery.
Tightening Specifications