S6 Quattro Sedan V10-5.2L (BXA) (2007)
-
Then wrap a clean rag around the connection and relieve residual pressure by carefully loosening the connection.
-
Observe safety precautions when disconnecting the battery.
-
Connectors should not show any signs of damage
-
Do not change bent shape
-
25 Nm
10
-
Pressure relief valve 120 bar
-
For high pressure line
-
25 Nm
11
-
High-pressure line
CAUTION:
-
Before opening high pressure components of the fuel injection system, pressure must be relieved to residual pressure.
-
Then wrap a clean rag around the connection and relieve residual pressure by carefully loosening the connection.
-
Observe safety precautions when disconnecting the battery.
-
Connectors should not show any signs of damage
-
Do not change bent shape
-
25 Nm
12
-
Bolt
-
9 Nm
-
Fasten in diagonal sequence in steps
13
-
Bolt
-
9 Nm
-
Fasten in diagonal sequence in steps