audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Power and Ground Distribution > < Starter With Manual Transmission, Removing and Installing|Page 5589
Page 4
background image

Install in reverse order of removal, noting the following:

-

Install battery carrier.

-

Install battery.

-

Perform work steps specified in table.

Tightening torques

Starter to transmission - bolt

80 Nm

Wire guide to starter - bolt

22 Nm

Terminal B+ to solenoid - nut

16 Nm

Battery carrier to long member - bolt

10 Nm

Power and Ground Distribution > < Starter With Manual Transmission, Removing and Installing|Page 5589