TT Coupe L4-2.0L Turbo (BPY) (2008)
‹› The engine must be no more than warm to touch.
-
Place toothed belt onto crankshaft sprocket (observe direction of rotation).
-
Secure lower toothed belt cover with two lower bolts.
-
Install vibration damper with new bolts.
-
Set crankshaft and camshaft to TDC at cylinder 1 - arrows -.
-
Route toothed belt in sequence: Tensioning roller, camshaft gear, coolant pump and last over the relay pulley - arrow -.