TT Quattro Coupe V6-3.2L (BHE) (2005)
-
Immediately install new gaskets to cylinder heads (ensure gaskets are installed over metal alignment pins numbered 1).
-
Secure gaskets to cylinder heads using threaded plastic alignment pins (pins numbered 2).
-
Apply a 2 mm wide continuous bead of sealant around entire periphery of each intake port of the secured intake gaskets (see dotted lines).
-
Tighten intake manifold bolts in stages and sequence shown in illustration 15-A073 to 11 Nm.
Tip:
After tightening manifold bolts to proper torque, the sealant needs to set up for one hour prior to starting the engine.
-
After the sealant has set up, run engine for 10 minutes.
-
Retighten intake manifold bolts in stages and sequence shown in illustration 15-A073 to 11 Nm.
On All Engines
After tightening intake manifold bolts to the proper torque, place a Red paint dot next to engine code sticker as shown in appropriate inspection
illustration.
Warranty
Required Parts and Tools
-
Manifold Gaskets Part No. 077 129 717Q
-
Sealant (Loctite 5970) Part No: D 176 501 A1
Part numbers listed in this bulletin are for reference only. Always check with your Parts Dept. for the latest parts information.