audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Heated Oxygen Sensor Before Catalytic Converter, Checking|Page 713 > < Heated Oxygen Sensor Before Catalytic Converter, Checking|Page 711
Page 3
background image

-

Remove the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module, Replacing ] See: Powertrain Management/Computers
and Control Systems/Engine Control Module/Testing and Inspection/Engine Control Module.

-

Using a Multimeter, check the Oxygen Sensor (O2S) Behind Three Way Catalytic Converter (TWC) ( G130) electrical harness connector
terminals to the Engine Control Module (ECM) (J623) electrical harness connector T81 terminals for resistance.

Specified value: 1.5 ohms Max.

If the specification was not obtained:

-

Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).

-

Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If no malfunction is found in the wiring:

-

Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic Mode 04 - Erase DTC Memory.

-

Perform a road test to verify repair.

If the DTC does not return:

Repair complete, Generate readiness code. Refer to => [ Readiness Code Description ] See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic Mode 09 - Read Vehicle Information. 

-

End diagnosis.

If the DTC does return and no malfunction is detected in the wiring and the voltage supply was OK:

-

Replace the Engine Control Module (ECM) (J623 ). Refer to => [ Engine Control Module, Replacing ] See: Powertrain Management/Computers
and Control Systems/Engine Control Module/Testing and Inspection/Engine Control Module.

-

Assembly is performed in the reverse of the removal.

Final procedures

After repair work, the following work steps must be performed in the following sequence:

Heated Oxygen Sensor Before Catalytic Converter, Checking|Page 713 > < Heated Oxygen Sensor Before Catalytic Converter, Checking|Page 711