TT Quattro Coupe V6-3.2L (CBRA) (2008)
Shifter A/T: Testing and Inspection
Selector Lever Voltage Supply, Checking
Selector Lever Voltage Supply, Checking
Special tools, testers and auxiliary items required
‹› Multimeter.
‹› Wiring diagram.
Test requirements
‹› The Direct Shift Gearbox (DSG) Mechatronic (J743 ) fuses OK.
‹› Battery voltage at least 12.5 volts.
‹› All electrical consumers such as, lights and rear window defroster, switched off.
‹› Selector lever in "P".
‹› A/C switched off.
‹› Ground (GND) connections between engine/transmission/chassis OK.
‹› Ignition switched off.
Test procedure
-
Perform a preliminary check to verify the customers complaint. Refer to => See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic Mode 09 - Read Vehicle Information
Start diagnosis
-
Remove the selector mechanism, far enough to gain access to the Selector Lever (E313) electrical harness connector - A -.
-
Disconnect the Selector Lever (E313) electrical harness connector - A -.
Checking voltage supply, terminal 30
-
Using a Multimeter, check the Selector Lever (E313) electrical harness connector terminals 10 to 1 for voltage.
Specified value: battery voltage.
If the specified value was not obtained: