TT Quattro Roadster L4-1.8L Turbo (AMU) (2002)
-
Remove upper nut on ball joint.
-
Apply ball joint puller as shown in illustration and press out ball joint.
Notes: To protect ball joint threads, leave nut on a few turns.
Installing
Tightening torques:
Ball joint to control arm 75 Nm
Use new nuts
Ball joint to wheel hearing housing 75 Nm
-
Secure ball joint to control arm (nuts on old marks).
Notes: Commercially available ring insertion tools (A/F 18 mm) can also be used instead of VAG 1332/10 e.g.: Stahlwille 732/10 or Hazet
6630c18.