TT Quattro Roadster V6-3.2L (BHE) (2005)
-
Remove socket head bolt - 1 -.
-
Move final drive approx. 15 to 20 mm - arrow -.
2 - Support for rear final drive
-
Set up special tools.
1 -
Washer
-
Remove bonded rubber bushing by turning spindle.
Installing
Installation position of bonded rubber bushing
Arrow on bonded rubber bushing - 1 - must point upward or downward.