TT Roadster L4-2.0L Turbo (BPY) (2008)
-
Fasten engine assembly mount to engine support - arrows -, bringing contact surfaces into contact using engine support bridge (10-222A).
-
Adjust engine mounts => [ Subframe Mount, Adjusting ] See: Body and Frame/Frame/Subframe/Front Subframe Mount/Adjustments.
-
Connect fuel hoses to connections. Make sure connector couplings are securely fastened.
-
Install air guide pipes and connector => [ Hose Connections with Connection Couplings, Assembly ] See: Powertrain Management/Fuel Delivery
and Air Induction/Turbocharger/Description and Operation
-
Install coolant expansion tank.
-
Install sound insulation.
-
Install engine cover.
-
Install vibration damper => [ Vibration Damper ] See: Cylinder Block Assembly/Harmonic Balancer - Crankshaft Pulley/Service and Repair.
-
Install ribbed belt => [ Ribbed Belt ] See: Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Ribbed Belt.