audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Timing Chain|Service and Repair|Page 2144 > < Timing Belt Tensioner|Specifications
Page 1
background image

Timing Chain: Service and Repair

Chain Sprocket

Special tools, testers and auxiliary items required

‹› Press tube (30 - 100)

‹› Thrust piece (40 - 105)

‹› Two-arm puller, commercially available

‹› Protective gloves

Removing

-

Remove oil pan with oil pump => [ Oil Pan ] See: Engine Lubrication/Oil Pan/Service and Repair/Oil Pan.

-

Remove front sealing flange => [ Front Sealing Flange ] See: Cylinder Block Assembly/Front Engine Plate/Service and Repair/Front Sealing
Flange.

-

Pull off crankshaft chain sprocket with claw puller - 2 - e.g. Kukko 44-1, while protecting end of crankshaft with special tool 40-105.

Installing

Installation is in reverse order of removal, note the following:

CAUTION!
Wear protective gloves!

-

Heat up chain sprocket in an oven for approx. 15 minutes at 220°C. 

‹› Installed location: Wider shoulder of chain sprocket faces toward engine. 

-

Using pliers, install chain sprocket on crankshaft end and slide onto crankshaft to stop using press tube (30 - 100).

Timing Chain|Service and Repair|Page 2144 > < Timing Belt Tensioner|Specifications