audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Evaporator Drain Tube|Testing and Inspection|Page 6718 > < Evaporator Drain Tube|Testing and Inspection
Page 2
background image

-

Carefully fold back the carpet near the condensate drain hose just enough until the drain is visible.

-

Make sure the condensation water drain - B - is routed correctly and is not block with dirt or constricted.

-

Cover area beneath opening - D - for condensation water drain - C -) with absorbent paper (so that any water present does not flow under carpet).

-

Remove condensation water drain - B -.

-

Check condensation water drain of A/C unit - A - for soiling (e.g. using a piece of wire).

-

Check the distance between the insulation mat installed in the center tunnel and the end of the drain hose -  - for the condensation water - C -
above the opening - D - in the floor panel. There must be enough distance so that the water can drain out of the hose - C -.

Installing

Installation is carried out in the reverse order, when doing this note the following.

-

Install the condensation water drain - B - so that it is not twisted or pinched.

-

When installing the carpet, take special care that it does not compress the condensation water drain - B -.

Evaporator Drain Tube|Testing and Inspection|Page 6718 > < Evaporator Drain Tube|Testing and Inspection