TT Roadster L4-2.0L Turbo (BPY) (2008)
-
Tie up left side of drive axle
-
Place used oil collection and extraction device ( V.A.G 1782) under transmission.
-
Remove left flange shaft bolt by installing 2 bolts in flange and counter holding flange shaft with assembly lever.
-
Remove flange shaft with spring, thrust washer and tapered ring.
Installing
‹› Torque specification => [ Flange Shafts and Shaft Seals Assembly Overview ] See: Flange Shafts and Shaft Seals Assembly Overview.
Install in reverse order, paying attention to the following:
-
Press flange shaft against spring force and tighten.
-
Install left drive shaft => Suspension, Wheels, Steering
40 Removal and Installation.
-
Tighten ball joint on control arm => Suspension, Wheels,
Steering 40 Description and Operation.