TT Roadster L4-2.0L Turbo (BPY) (2008)
-
Fill area between sealing lip and dust lip halfway with Sealing Grease (G 052 128 A1).
-
Clamp flange shaft in vise, using jaw protectors.
-
Press previous circlip out of flange shaft grooved with new circlip - A -.
-
Drive on flange shaft with plastic hammer and possibly drift.
-
Install driveshaft on flange shaft. Refer to => Suspension,
Wheels, Steering 42 Removal and Installation.
-
Axle oil level in rear final drive, checking. Refer to => [ Axle Oil Level in Rear Final Drive ] See: Fluid - Differential/Service and Repair/Axle Oil
Level in Rear Final Drive.