audi Workshop Repair Guides

Audi TT Roadster Turbo Workshop and Repair Manuals

Turbocharger Recirculating Valve (N249), checking|Page 2749 > < Turbocharger Recirculating Valve (N249), checking|Page 2747
Page 1
background image

Air Bypass Valve: Testing and Inspection
Wastegate Bypass Regulator Valve (N75), checking

Wastegate Bypass Regulator Valve (N75), checking

Special tools, testers and auxiliary items required

‹› Multimeter.

‹› Wiring diagram.

Test requirements

‹›  The Fuse (SB12) OK.

‹›  The Motronic Engine Control Module (ECM) Power Supply Relay (J271) OK.

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› On vehicles with automatic transmission, selector lever in position " P" or "N".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

‹› Voltage for the Wastegate Bypass Regulator Valve ( N75) is supplied by the Motronic Engine Control Module (ECM) Power Supply Relay

(J271).

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to => [ replacing ] See: Computers and Control Systems/Engine Control
Module/Testing and Inspection/Engine Control Module (ECM) (J623).

Start diagnosis

-

Remove the engine cover with air filter.

Checking internal resistance

-

Disconnect the Wastegate Bypass Regulator Valve ( N75) electrical harness connector- 1 -.

-

Using a multimeter, check the Wastegate Bypass Regulator Valve (N75) terminals 1 to 2 for resistance. 

Turbocharger Recirculating Valve (N249), checking|Page 2749 > < Turbocharger Recirculating Valve (N249), checking|Page 2747