TT Roadster L4-2.0L Turbo (CCTA) (2008)
‹› Tightening order => [ Sealing flange tightening sequence ]
5
Intermediate plate
‹› Must be located on dowel sleeves
‹› Do not damage or bend when doing assembly work
‹› Is hooked in at sealing flange => [ Installing intermediate plate ]
6
Bolt
‹› For dual-mass flywheel/drive plate
‹› 60 Nm plus an additional 90° turn
‹› Replace
7
Dual mass flywheel
‹› Dual-mass flywheel, removing and installing => [ Dual Mass Flywheel ] See: Transmission and Drivetrain/Flywheel/Service and Repair
‹› Only possible to install in one position - Bores are offset
8
Fitting pin
Sealing flange tightening sequence
-
Tighten the bolts - 1 through 8 - in the sequence shown:
-
1. Tighten the bolts by hand.
-
2. Tighten the bolts to 9 Nm.
Installing intermediate plate