audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Turbocharger Recirculating Valve, Checking|Page 2852 > < Turbocharger Recirculating Valve, Checking|Page 2850
Page 1
background image

Air Bypass Valve: Testing and Inspection
Wastegate Bypass Regulator Valve, Checking

Wastegate Bypass Regulator Valve, Checking

Special tools, testers and auxiliary items required

‹› multimeter.

‹› Wiring diagram.

Test requirements

‹›  The Motronic Engine Control Module (ECM) (J623) fuses OK.

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› On vehicles with automatic transmission, selector lever in position " P" or "N".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Computers and Control Systems/Testing
and Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Remove the engine cover with air filter.

Turbocharger Recirculating Valve, Checking|Page 2852 > < Turbocharger Recirculating Valve, Checking|Page 2850