audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Toothed Belt <--> [Timing Belt]|Removal|Page 1235 > < Toothed Belt <--> [Timing Belt]|Removal|Page 1233
Page 1
background image

Toothed Belt: Service and Repair
Installation

Toothed belt, installing 

Note:  Before installing a new belt, the rollers and tensioners must be checked for dirt, rough running and ease of rotation.  Clean or replace

rollers and tensioners as necessary.

fit toothed belt at crankshaft and install vibration damper with toothed belt on crankshaft

reinstall four securing bolts

hand tighten only

apply locking sealant AMV 188 001 02 to center bolt and tighten by hand

use holding tool 3197

install camshaft sprockets (must be left loose on camshaft tapers) with mounting bolts loosened one turn

install vibration damper locking device 3211

Note:  If there is NO hole in the vibration damper to accept special tool VAG 3211 you MUST manually ensure that the TDC mark on the

vibration damper is aligned with the TDC pointer BEFORE AND AFTER tightening the camshaft sprockets.

Caution! 

Tool 3211 must not be used as a holding tool to tighten center bolt

guide toothed belt into position on all sprockets and water pump pulley

install idler pulley with eccentric

Toothed Belt <--> [Timing Belt]|Removal|Page 1235 > < Toothed Belt <--> [Timing Belt]|Removal|Page 1233