1 Series E81 116i (N43) 3-door
Loosen bolts of high-pressure pump (1).
Note:
•
Loosen bolts only to such an extent that the high-pressure
pump can still be moved direction of arrow.
Install delivery line (1).
Important!
Connect pressure line (1) without tension only.
Nuts (3) must be able to be screwed on easily by hand.
If necessary, turn high-pressure pump (2) to align in direction
of arrow.
Tighten down bolts of high-pressure pump (1).
Note:
•
Evenly tighten bolts alternately to avoid the high-pressure
pump twisting!
•
Tightening torque 13 51 1AZ
.
Tighten nuts of delivery line (1) in illustrated sequence.
Tightening torque 13 53 4AZ
.
RA Removing and installing or replacing delivery line (between high-pressure pump a
BMW AG - TIS
15.01.2013 14:45
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -