bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 AZD Wires To Starter > < 1 AZD Starter Motor With Mounting
Page 1
background image

12 42 Starter line (N43) 

Type

Thread

Tightening specification

Measure

1AZ  Line, starter-alternator, to jump-start

connection point

M8x14

19 Nm

2AZ  Line, starter-alternator, to jump-start

connection point

M8 nut

Replace nut

11.6 Nm

3AZ  EMC strap to body

M6 nut

8 Nm

4AZ  EMC strap to engine

M6x16

8 Nm

5AZ  Assembly, line, alternator-starter, to

alternator

M8 nut

19 Nm

6AZ  Ground cable to engine support arm

M8

19 Nm

8AZ  Ground cable to longitudinal member

M8

19 Nm

9AZ  Ground rail to longitudinal member

M8 nut

19 Nm

10AZ  Assembly, line, alternator-starter, to

starter

M8 nut

13.4 Nm

AZD  Starter line (N43)

BMW AG - TIS

16.01.2013  02:03

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 AZD Wires To Starter > < 1 AZD Starter Motor With Mounting