bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing All Main Crankshaft Bearing Shells (N46T)|Page 301 > < 2 RA Replacing All Main Crankshaft Bearing Shells (N46T)|Page 299
Page 6
background image

Check axial play.

If permitted axial clearance is exceeded, check and if necessary
replace crankshaft, guide bearing shells and crankcase.

Axial clearance.

Assemble engine:

Install all pistons.

Install radial shaft seal at rear.

Install flywheel.

Install cylinder head.

Install timing chains.

Adjust valve timing.

Install radial shaft seal at front.

Important!

The following text describes installation and sealing between
the engine block and radial shaft seal.

The engine block will not be leakproof at the outside of the
radial shaft seal if you fail to comply with the individual work
steps and the work sequence.

Note:

The required parts are available from the BMW Parts Service
(ETK).

Remove screw caps (1) from injector (2).

Insert plunger.

Injector (2) contains the sealing compound Loctite,
manufacturer's number 128357.

Bottle (3) contains the primer Loctite, manufacturer's
number 171000.

RA  Replacing all main crankshaft bearing shells (N46T)

BMW AG - TIS

18.01.2013  20:07

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 6 -

2 RA Replacing All Main Crankshaft Bearing Shells (N46T)|Page 301 > < 2 RA Replacing All Main Crankshaft Bearing Shells (N46T)|Page 299