bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Lowering_raising Front Axle Carrier (special Tool SWZ00-2040)|Page 901 > < 2 RA Lowering_raising Front Axle Carrier (special Tool SWZ00-2040)
Page 2
background image

Version with Electric Power Steering (EPS):

Cut open cable tie (1) for connecting line on front axle carrier.

Warning!

Risk of injury!

Failure to comply with the following instructions may result in
the vehicle slipping off the lifting platform and critically injuring
other persons.

 

When supporting components, make sure that

the vehicle can no longer be raised or lowered

the vehicle does not lift off the locating plates on the
lifting platform

If necessary, position special tool  00 2 040  with a 2nd person
helping on workshop jack.

Insert special tools 31 4 051  and 31 4 060  into corresponding
mountings of special tool 00 2 040 .

Align special tool  00 2 040  to front axle carrier.

Note:

Make sure when raising that the special tools 31 4 060  are
correctly inserted in the rear recesses on the front axle carrier.

 

If necessary, lower special tool 33 3 274.

Support front axle carrier by raising special tool  00 2 040 .

Important!

Pay attention to power steering hoses and lines when
lowering and raising. Hoses/lines must not be
kinked/tensioned/bent!

RA  Lowering/raising front axle carrier (special tool SWZ00-2040)

BMW AG - TIS

18.01.2013  21:39

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

2 RA Lowering_raising Front Axle Carrier (special Tool SWZ00-2040)|Page 901 > < 2 RA Lowering_raising Front Axle Carrier (special Tool SWZ00-2040)