bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Leak-testing Condenser|Page 2378 > < 9 RA Instructions For Opening And Replacing Parts In Refrigerant Circuit|Page 2375
Page 1
background image

64 51 ...

Leak-testing condenser 

Special tools required:

64 5 121

64 5 122

64 5 123

Warning!

Risk of injury!

Refrigerant circuit is under high pressure!

Follow safety instructions for handling refrigerant

Comply with the standard national safety instructions and
precautions on handling nitrogen.

Ensure that employees are advised of how to handle
pressurized vessels and nitrogen correctly (danger of
asphyxiation). For this purpose, follow the notes and
instructions in the technical safety specifications available
from the gas supplier.

Necessary preliminary tasks:

Drain off air conditioner

Detach refrigerant lines from condenser

Tightening torque 64 53 6AZ

.

E70 only:

Tightening torque 64 53 3AZ

.

Important!

Risk of damage!

Special tool  64 5 122 and special tool  64 5 123 have
different diameters (A, B) at the seal plugs!

Ensure correct connection assignment on condenser.

Replace sealing rings (1) prior to each use.

RA  Leak-testing condenser

BMW AG - TIS

22.01.2013  09:47

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Leak-testing Condenser|Page 2378 > < 9 RA Instructions For Opening And Replacing Parts In Refrigerant Circuit|Page 2375