bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 SBT Integrated Heating Control And Air-conditioning System E70, E81, E82, E87, E90, |Page 3919 > < 2 SBT Integrated Heating Control And Air-conditioning System E70, E81, E82, E87, E90, |Page 3917
Page 9
background image

from 03/2007: Filter replacement: see Service Booklet

> E70: IHKA

Filter replacement: see Service Booklet 

Stratification control and rear stratification control 

> E70 IHKA High and E90, E91, E92, E93 IHKA

The selected potentiometer setting is transposed into the flap position of the specific flap motor (front and rear
stratifying flap motor and rear ventilation flap motor).

> E70 IHKA High with automatic rear air conditioning

Due to the separate settings for the left and right sides in the rear, there are 2 rear stratification controls and
2 ventilation flap motors in the rear.

LIN bus 

A data line supplies all component on the LIN bus with the necessary control information. This data line also
carries the status reports of the components back to the IHR/IHKR/IHKA control unit. The control unit controls
the following components via the LIN bus:

Electric auxiliary heater 

Flap motors

The following control units contribute to the operation of the IHR/IHKR/IHKA:

SZM: Centre console switch cluster 

The SZM is connected to the IHR/IHKR/IHKA control unit via a 14-pin connector. 
The IHR/IHKR/IHKA control unit serves as the interface between the SZM and the K-CAN. 

The IHR/IHKR/IHKA control unit assumes the following tasks for the SZM:

Reading off settings made by pressing buttons

Actuating LEDs for function lighting

Dimming LEDs for function and search lighting

Forwarding relevant CAN messages

JBE: Junction box electronics

The JBE is the data interface (= gateway) between the K-CAN and the PT-CAN. (K-CAN = body CAN; PT-CAN
= powertrain CAN.)

The JBE receives input signals from some of the sensors and control units (e.g. AUC sensor, DME/DDE control
unit, IHR/IHKR/IHKA control unit).

The junction box consists of the JBE and the power distributor. Amongst other things, the power distributor
supplies power to the heated rear window. The JBE controls the heated rear window.

M-ASK or CCC or CHAMP: Multi-audio system controller or Car Communication Computer or multimedia
platform

The controller signals for selecting the menu are processed in the M-ASK or CCC or CHAMP (multimedia
platform: CHAMP; Central Head Unit and Multimedia Platform). 

To actuate the CID (Central Information Display), the red-green-blue signals from the graphics processor are
converted into digital signals.

CAS: Car access system

The CAS comprises the remote control functions, amongst other things. 

The CAS assigns a personal ID code to every remote control. The CAS transfers the personal ID code to the
IHKA control unit via the K-CAN.

Key-based settings (Key Memory) are stored in the IHKA control unit.

SBT  Integrated heating control and air-conditioning system E70, E81, E82, E87, E90, 

BMW AG - TIS

18.01.2013  18:47

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 9 -

2 SBT Integrated Heating Control And Air-conditioning System E70, E81, E82, E87, E90, |Page 3919 > < 2 SBT Integrated Heating Control And Air-conditioning System E70, E81, E82, E87, E90, |Page 3917