bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Removing And Installing_replacing Pressure Accumulator Of Injection System (N47)|Page 537 > < 1 RA Layout Of Common Rail System (N47)
Page 1
background image

13 53 155

Removing and installing/replacing pressure
accumulator of injection system (N47)

Remove acoustic cover

Replace pressure lines

Disconnect pressure line from high-pressure pump, refer to
"Pressure line (high-pressure pump)"

Important!

When working on the oil, coolant or fuel circuit, you must
protect the alternator against contamination.

Cover alternator with suitable materials.

Failure to comply with this procedure may result in an
alternator malfunction.

Recycling:

Catch and dispose of escaping fuel.

Observe country-specific waste-disposal regulations.

Detach plug (1) from pressure regulator.

Detach return line (2) from pressure accumulator.

Detach plug from pressure sensor (3).

RA  Removing and installing/replacing pressure accumulator of injection system (N47)

BMW AG - TIS

22.01.2013  14:25

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 RA Removing And Installing_replacing Pressure Accumulator Of Injection System (N47)|Page 537 > < 1 RA Layout Of Common Rail System (N47)