bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Removing And Installing Or Replacing One Delivery Line (N43) > < 2 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 562
Page 7
background image

Tighten down screw.

Tightening torque 13 53 5AZ

.

Connect contact plug (1) to low-pressure sensor (2).

Important!

Only if high-pressure rail has been replaced:

Slacken off nuts of delivery lines by 90

°

 in illustrated sequence

and then retighten:

Tightening torque 1, 2, 4 and 5: 

13 53 9AZ

Tightening torque 3: 

13 53 10AZ

Connect fuel line (1).

Check fuel system for leaks.

Assemble engine.

Check function of DME.

RA  Removing and installing or replacing high-pressure rail (N43)

BMW AG - TIS

23.01.2013  07:15

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 7 -

3 RA Removing And Installing Or Replacing One Delivery Line (N43) > < 2 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 562