bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing All Connecting Rod Bearings (N43)|Page 299 > < 1 RA Removing And Installing Or Replacing Vibration Damper (N43)|Page 296
Page 1
background image

11 24 571

Replacing all connecting rod bearings (N43)

Special tools required:

00 2 590

00 9 120

Necessary preliminary tasks:

Remove all pistons. 

Important!

Note grinding stages on crankshaft.

Replacement crankshaft identification:

The letter featured in the illustration at the 1st position on the
replacement crankshafts denotes the conrod construction stage.

B = construction stage 1 (- 0.25 mm)

C = construction stage 2 (- 0.50 mm)

Note:

Production crankshafts have no identification for conrod bearings.

Install new connecting rod bearing shells.

Install one blue (1) and one red (2) bearing shell in each conrod.

RA  Replacing all connecting rod bearings (N43)

BMW AG - TIS

15.01.2013  12:37

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Replacing All Connecting Rod Bearings (N43)|Page 299 > < 1 RA Removing And Installing Or Replacing Vibration Damper (N43)|Page 296