1 Series 120i (N43) Convertible
Install feed line (1).
In so doing, tighten nut (2) and screw (3) hand-tight only.
Tighten nut (1).
Tightening torque 13 53 4AZ
.
Tighten down screw.
Tightening torque 13 53 5AZ
.
Connect contact plug (1) to low-pressure sensor (2).
Connect fuel line (1).
RA Removing and installing or replacing delivery line (between high-pressure pump a
BMW AG - TIS
15.01.2013 13:14
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -