bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

11 RA Additional Work On CNG Vehicle (removing And Installing Gas Lines On Metering Un|Page 682 > < 10 RA Additional Work For CNG Vehicle (remove And Install Low-pressure And Metering Un|Page 680
Page 1
background image

13 80 710

Additional work on CNG vehicle (removing
and installing gas lines on metering unit,
vacuum and hot water connections on low-
pressure unit)

Drain CNG system,

refer to section on draining the CNG system

Unfasten banjo bolts (1) of air intake lines on low-pressure unit.

Installation:

Replace sealing rings.

Tightening Torque,

refer to Technical Data 13 81 1AZ

Mark vacuum hoses (1 to 3), open hose clamps and pull off
hoses.

Remove coolant hose on low-pressure unit. Loosen hose clamp
and pull off coolant hose.

Installation: 

Replace hose clamp and replace coolant hose if necessary.

RA  Additional work on CNG vehicle (removing and installing gas lines on metering un

BMW AG - TIS

17.01.2013  12:49

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

11 RA Additional Work On CNG Vehicle (removing And Installing Gas Lines On Metering Un|Page 682 > < 10 RA Additional Work For CNG Vehicle (remove And Install Low-pressure And Metering Un|Page 680