bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Removing And Installing _ Replacing Actuating Unit (cables) For Left And Right S|Page 1982 > < 4 RA Removing And Installing _ Replacing Actuating Unit (cables) For Left And Right S|Page 1980
Page 3
background image

Only for replacement actuating unit:

Installation:

Grease actuating unit (1) on left and right (2) (fulcrum pads
and cables).

Only for replacement of actuating unit:

Installation:

Insert actuating unit (1) in frame of folding sun roof as far as
assembly stop (2).

Install drive unit (motor / gearbox),

refer to 54 11 010

Installation:

Uniformly insert headliner (1) and cover (2) on left / right of
folding sun roof frame.

Fit spacers (3) (same number as removal) to left / right with
butylene thread.

Installation:

Insert butylene thread (1) in end stops.

Caution!

Do not obstruct water drainage channels.

RA  Removing and installing / replacing actuating unit (cables) for left and right s

BMW AG - TIS

07.02.2013  03:28

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

4 RA Removing And Installing _ Replacing Actuating Unit (cables) For Left And Right S|Page 1982 > < 4 RA Removing And Installing _ Replacing Actuating Unit (cables) For Left And Right S|Page 1980