bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

17 RA Installing Replacement Transmission (A4S 270R, A4S 310R) > < 16 RA Removing And Installing Automatic Transmission (A5S 300J)|Page 955
Page 7
background image

Bore (3) on drive plate must point perpendicularly to center of
opening in oil sump.

Lift automatic transmission until bore (3) in drive plate is reached.

Guide transmission in carefully with special tool 24 2 300 in
bore (3) on the drive plate.

Bolt transmission housing to engine.

Unscrew special tool 24 2 300 from the tab towards the front.

Mount torque converter.

ATF level must be checked after installation of the transmission.

Car must be stationary on a level surface.

Only check oil level at a transmission oil temperature of 30 ... 55

°

C.

Interrogate with Service Tester of MoDiC (refer to Test Plan)

Run engine in selector lever setting "P" or "N".

Unfasten filler screw (1).

Installation:

Check seal, replacing if necessary.

Tightening torque,

refer to Technical Data 24 11 7AZ.

Check ATF level, correcting if necessary.

Pour in ATF-oil using filler (2) (refer to BMW Parts) until it runs
out of the overflow hole.

Caution!

Only ATF approved for Jatco transmissions may be used.

RA  Removing and installing automatic transmission (A5S 300J)

BMW AG - TIS

06.02.2013  23:33

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 7 -

17 RA Installing Replacement Transmission (A4S 270R, A4S 310R) > < 16 RA Removing And Installing Automatic Transmission (A5S 300J)|Page 955