bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Replacing O-ring For Output Flange (A5S 300J) > < 3 RA Replacing Output Flange|Page 1100
Page 1
background image

24 13 706

Replacing bearing on transmission extension
(A5S 310Z)

(output flange removed)

Lift out circlip (1).

Remove ball ring (2).

Heat transmission extension beside bearing race to approx. 80 

°

C (hot air blower).

Remove bearing race (3).

Installation:

First insert ball ring (4) before installing bearing race.

Caution!

Axial play must be checked and, if necessary, adjusted,

refer to 24 13 156

RA  Replacing bearing on transmission extension (A5S 310Z)

BMW AG - TIS

07.02.2013  00:36

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

5 RA Replacing O-ring For Output Flange (A5S 300J) > < 3 RA Replacing Output Flange|Page 1100