3 Series E36 323i (M52) COUPE
M40 engine:
Remove heater bulkhead.
Unscrew cable duct from rear end of engine.
Mount special tool 00 0 200 and hook it into the eye on the
crankcase.
Tighten spindle (1).
M50/ M52 engine:
Remove heater bulkhead.
Unscrew injection pipe cover (1). Screw special tool 11 0 030
down through intake manifold and into bracket of crankcase.
Fit special tool 00 0 200 and attach to special tool 11 0 030 .
Tighten spindle (2).
M41/M43 engine:
Attach special tool 11 8 022 to left and right control arms.
Caution!
Position special tool 11 8 022 so that engine oil sump rests
securely on special tool 11 8 022 .
Tighten down knurled screws until special tool 11 8 022
contacts engine oil sump.
Support transmission with a workshop hoist.
Unfasten screws and remove cross member with rubber mount.
Lower workshop hoist.
Installation:
Tightening torque, 23 71 1AZ/2AZ.
RA Removing and installing transmission (S5D 200G, S5D 250G)
BMW AG - TIS
08.02.2013 05:12
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -