3 Series E36 323ti (M52) COMP
Installation:
Clean back of profile rail, side of frame on folding sun roof and
sealing channels (1) in corner sections.
Remove spacers (1) on left and right sides.
Installation:
Reinstall same number as was removed.
Invert frame of folding sun roof.
Evenly pull headliner (1) and cover (2) on left/right backwards to
remove.
Only replacement of actuating unit:
Remove drive unit (motor / gearbox),
refer to 54 11 010
Pull actuating unit (cables) backwards to remove, gripping the
fulcrum pads (1).
RA Removing and installing / replacing actuating unit (cables) for left and right s
BMW AG - TIS
08.02.2013 17:29
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -