bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

22 Planetary Drive > < 4 RA Replacing Bearing On Transmission Extension (A5S 310Z)
Page 1
background image

24 20 001

Replacing O-ring for output flange
(A5S 300J)

Remove complete exhaust system,

refer to 18 00 020.

Remove propeller shaft from transmission and center
mount,

refer to 24 00 027.

Brace output flange with special tool 23 0 020.

Loosen stop nut (1).

Installation:

Replace stop nut.

Tightening torque, refer to Technical Data.

Lever O-ring (2) out using a scribe.

Installation:

Lubricate O-ring (2) lightly with oil and install it in the groove.

Note:

Check ATF level, refer to 24 00 027

RA  Replacing O-ring for output flange (A5S 300J)

BMW AG - TIS

09.02.2013  16:13

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

22 Planetary Drive > < 4 RA Replacing Bearing On Transmission Extension (A5S 310Z)