3 Series E36 M3 (S50) CONVER
Installation:
If air pipe is pulled out together with the injection pipe (due to
inclined retaining tabs), all O-rings on the pipe necks must be
replaced.
When fitting, coat all O-rings with lubricant SAE 90.
Lift out retainers (1) and remove fuel injection valves (2) from fuel
rail.
Installation:
Check O-rings, replacing them if necessary.
When fitting, coat all O-rings with lubricant SAE 90.
RA Replacing complete injection pipe (S50)
BMW AG - TIS
09.02.2013 21:51
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -