3 Series E36 Z3 (M44) ROADST
Topping up fluid in hydraulic unit:
-
Remove luggage compartment trim on left.
-
Open convertible top (motor-driven) once and close again to
bleed the system
-
Convertible top must be closed
-
Open emergency valve counterclockwise by a half turn
(system is depressurized).
Installation:
-
Replace oil filler plug and seal
Tightening torque: 54 34 5AZ
-
Check fluid level after filling (see work step further
above)
Older hydraulic unit:
-
Undo oil filler plug (2). Replenish as much hydraulic fluid
(sourcing reference: BMW Parts Service) until it lies in area of
marking (3)
-
Close emergency valve (1).
New hydraulic unit:
-
Partially remove hydraulic unit
-
Turn hydraulic unit so that oil filler plug (1) points upwards
-
Undo oil filler plug (1).
Tightening torque: 54 34 5AZ
-
Replenish hydraulic fluid (sourcing reference: BMW Parts
Service) until it lies in area of marking (2)
-
Position hydraulic unit in mounting and check fluid level,
install if necessary
-
Close emergency valve (3).
RA Notes on EH convertible top (Z3 Roadster, M Roadster)
BMW AG - TIS
11.02.2013 07:09
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -