bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Timing Chain (N40)|Page 595 > < 3 RA Replacing Timing Chain (N40)|Page 593
Page 9
background image

Replace sealing ring on plug (1).

Insert plug (1) and tighten down.

Tightening torque 45 Nm.

Install bearing pin of chain guide and tighten down.

Replace sealing ring on plug (1).

Insert plug (1) and tighten down.

Tightening torque: 25 Nm.

Check hub (2), replace if necessary.

Install hub (2).

RA  Replacing timing chain (N40)

BMW AG - TIS

22.01.2013  07:48

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 9 -

3 RA Replacing Timing Chain (N40)|Page 595 > < 3 RA Replacing Timing Chain (N40)|Page 593