3 Series E46 316ti (N42) COMP
-
Allow approx. 10 cm of mixed adhesive to emerge and then apply the mixed adhesive first on one side of the
adhesive area.
-
After applying the adhesive, check whether an adhesive component has emerged at the back of the cartridge. If
yes, break off the bonding procedure. Clean new component. Use new adhesive cartridge. Contact national
hotline.
-
Use a spatula to spread the adhesive over the adhesive area. Thickness of layer approx. 2 mm (dependent on
adhesive gap).
-
Potlife of mixed adhesive approx. 2 hours. A change of mixer is only necessary if over a period of 1 hour no
material has flowed through the mixer.
-
Join, secure and rivet and/or weld new parts in accordance with repair instructions.
-
Remove excessive glue with paper or cloths.
5.0 Hardening times:
The hardening time is:
-
Either 48 hours at a minimum of 15
°
C (room temperature) up to vehicle operational strength.
-
Or 1 hour in the spraying booth (booth temperature 80
°
C/ object temperature 60
°
C) up to vehicle operational
strength.
-
Do not use radiant heaters for hardening. Risk of adhesive being destroyed at temperatures of
≥
120
°
C.
-
Do not apply load to glued parts until they have hardened!
6.0 Aftertreatment of bonding surfaces:
-
Seal all bonding surfaces with cavity sealant.
7.0 Disposing of adhesive:
-
Small amounts of mixed and hardened adhesive residue can be disposed of as domestic waste.
These regulations apply to the Federal Republic of Germany.
For other countries, comply with the (possibly differing) nationally applicable regulations.
RA Bonding steel parts
BMW AG - TIS
25.01.2013 18:36
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -