bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Removing And Installing_sealing Or Replacing Complete Main Flow Oil Filter (M47T|Page 634 > < 1 RA Removing And Installing_sealing Or Replacing Complete Main Flow Oil Filter (M47T
Page 2
background image

Remove engine underguard.

Drain and dispose of coolant.

Refer to general instructions for work on cooling system.

Installation:

Replace seal.

Tightening torque, 11 11 5AZ .

Cooling system must be topped up, vented and checked for leaks.

Release clamp from intake pipe on exhaust gas recirculation valve
(EGR).

Detach clamp from EGR cooler/pipe.

Installation:

Tightening torque 11 71 1AZ

Release cable.

Disconnect plug from electropneumatic pressure transducer
(EPPT) for exhaust gas recirculation valve (EGR).

Release screws (arrow).

Remove EGR valve.

Detach coolant hose on engine side from quick-release coupling 

and place to one side.

Note:

Illustration of removed line

Disconnect all quick-release couplings on coolant connecting line.

Release the two retaining screws.

Remove coolant connecting line.

RA  Removing and installing/sealing or replacing complete main flow oil filter (M47T

BMW AG - TIS

11.02.2013  16:45

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

1 RA Removing And Installing_sealing Or Replacing Complete Main Flow Oil Filter (M47T|Page 634 > < 1 RA Removing And Installing_sealing Or Replacing Complete Main Flow Oil Filter (M47T