bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Safety Battery Terminal (SBK) > < 1 RA Replacing Battery Positive Lead (M47TU)
Page 2
background image

Release positive lead from retaining clip.

Release positive leads from terminal to alternator (1) and from
alternator to starter motor (2).

Note:

Line (3) leads to auxiliary heater.

Installation:

Tightening torque, 12 31 1AZ.

Disconnect battery negative lead (1) to alternator at solenoid
switch of starter motor.

Tightening torque, 12 41 4AZ.

Note:

Read out fault memory of DDE control unit.

Check stored fault messages.

Rectify faults.

Then clear fault memory.

RA  Replacing battery positive lead (M47TU)

BMW AG - TIS

12.02.2013  04:19

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

2 RA Replacing Safety Battery Terminal (SBK) > < 1 RA Replacing Battery Positive Lead (M47TU)