3 Series E46 323Ci (M52TU) COUPE
Detach cable plug from fixture and disconnect.
Release screw (1) and remove interlock cable (2) from interlock
lever (3).
Installation:
Adjust interlock cable and check interlock operation.
Release screws and remove shift tower with cable.
Tightening torque, 25 16 3AZ.
RA Removing and installing/replacing shift tower
BMW AG - TIS
13.02.2013 08:56
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -