bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

6 RA Replacing Shift Actuator GS6S37BZ SMG (transmission Removed) > < 5 RA Replacing Shift Actuator GS5S31BZ (SMG)
Page 2
background image

Release screw.

Tightening torque, 23 31 3AZ .

Installation:

Replace screw.

Release banjo bolt (1).

Tightening torque, 23 41 13AZ .

Installation:

Replace gaskets.

Release retaining screws (2) and (3) for hydraulic lines.

Tightening torque, 23 41 12AZ .

Installation:

Replace hydraulic lines (4).

Release screws.

Tightening torque, 23 41 7AZ .

Remove shift actuator (5).

Installation:

Coat sealing surface with surface sealing compound.

RA  Replacing shift actuator GS5S31BZ (SMG)

BMW AG - TIS

13.02.2013  14:25

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

6 RA Replacing Shift Actuator GS6S37BZ SMG (transmission Removed) > < 5 RA Replacing Shift Actuator GS5S31BZ (SMG)