bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

54 Throttle And Operation > < 1 RA Replacing Complete Injection Pipe (M56)|Page 731
Page 4
background image

Unfasten screws.

Lift out injection pipe (1).

Detach special tool  13 1 142 from injector.

Install injection pipe (1).

Install and tighten down screws.

Tighten down fuel line (5).

Tightening torque  13 53 15AZ

.

Push on terminal strip (4) until it snaps audibly into place.

Push on vent hose (3).

Install holders for plug connections (2).

Push plug connections (1 and 2) into holders.

RA  Replacing complete injection pipe (M56)

BMW AG - TIS

14.02.2013  09:46

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

54 Throttle And Operation > < 1 RA Replacing Complete Injection Pipe (M56)|Page 731