3 Series E46 330d (M57) SAL
Note on installation (except E46 Compact):
Pull off cover tape from butylene tape on both sides.
Stick butylene tape (1) to outside of center bearing (2).
Butylene tape,
refer to BMW Parts Service.
Important!
Remove butylene tape already attached to center bearing.
Clean adhesive area on center bearing and on body.
Then coat adhesive area on body with mineral oil.
This coating with oil is necessary to facilitate insertion of the
sticky butylene tape in the propeller shaft tunnel.
This prevents the butylene tape from being deformed.
Installation:
Press center bearing (2) into transmission tunnel.
Lift out retainer (1).
Disconnect shift rod (2).
Installation:
Grease selector rod.
Grease,
refer to BMW Service Operating Fluids.
Pay attention to position of shims (3).
RA Removing and installing transmission (GS5-39DZ, M47TU / M57)
BMW AG - TIS
15.02.2013 06:49
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -